航空航天港

 找回密码
 注册会员

QQ登录

只需一步,快速开始

返回列表
查看: 52621|回复: 251
收起左侧

[其他发射] 2019年7月15日05:21 月船2号/Chandrayaan-2月球探测器将由GSLV-MK3自达万航天中心发射

  [复制链接]
jingyan66 发表于 2009-1-18 09:28 | 显示全部楼层 |阅读模式

对本站感兴趣的话,马上注册成为会员吧,我们将为你提供更专业的资讯和服务,欢迎您的加入!

您需要 登录 才可以下载或查看,没有帐号?注册会员

x

ISRO begins work on Chandrayaan-II project



Saturday, January 17, 2009 : 1850 Hrs   Hindu
Chennai, Jan 17 (PTI) ISRO has begun working on the Rs 425-crore second unmanned moon mission to be launched by early 2012 following the success of Chandrayaan-I, a top ISRO official said here on Saturday.
Chandrayaan-II will focus on soil and mineral exploration on the lunar surface with the help of a robotic device and send back data, Chandrayaan Project Director Mayilsamy Annadurai told reporters here.
The work had begun on the project and it was likely to be launched by end of 2011 or early 2012, he said. ISRO plans to send a manned flight to space in 2015 and the manned mission to the moon in 2020, he added.
About Chandrayaan-I, he said it has beamed 40,000 pictures since its launch.
The stakeholders of the project would meet soon to discuss the information beamed by India's successful lunar mission, Annadurai said.
kktt 发表于 2009-1-21 20:37 | 显示全部楼层

月船2号

北京时间1月21日消息 据俄罗斯《纽带》网报道,印度宇航局发言人近日宣布,印第二部月球探测器——“月船2号”将在2011年底或2012年初发射。目前,科学家们已开始着手相关的研制工作。


                               
登录/注册后可看大图


印度“月船2号”上月球车构造示意图

印宇航局发言人介绍称,“月船2号”探测器的主要任务是对月球表面的化学成份进行研究。为此,“月船2号”探测任务实际上将由两部探测器组成——一部为轨道探测器,另一部为自动月球车。按照计划,月球车将在月表实现软着陆并采集土壤样本进行分析。月球车获取的分析数据将经由轨道探测器传回地球控制中心。

“月船2号”探测任务将由印度宇航局与俄罗斯航天局联合实施。此前有消息称,“月船2号”任务中使用的月球车将完全由俄方企业制造。专家们指出,这部月球车将通过太阳能获取能量供应,其在月球表面的工作时间将持续约1年左右。

“月船1号”探测器于2008年10月22日顺利发射升空。其一项主要任务是搜集月球表面的矿物和化学成份数据。该探测器在进入月球轨道后,于11月14日成功向月表投放了一个撞击探测器。该撞击探测器是“月船1号”所携11件载荷之一。撞击探测器除装备一套摄像系统以外,还携有一台雷达高度计和一台质谱仪,分别用于测量探测器落向月表的速度和探测月球上空极为稀薄的大气。
 楼主| jingyan66 发表于 2009-1-22 09:39 | 显示全部楼层

“月船”-2重2,700kg

India's Chandrayaan-II Preps for Second Lunar Trip


January 18, 2009


They're busy at work on the engineering aspect of Chandrayaan-II, which has begun and is scheduled to be launched by 2012, according to Mayilsamy Annadurai, Project Director Chandrayaan-1. “The total cost of the project is Rs. 425 crore,” he told journalists after calling on Tamil Nadu Chief Minister M. Karunanidhi at his residence here. He said though the lander-cum- rover was an Indo-Russian joint venture, Russia would share the major responsibility for the lander-cum-rover.

“The orbiter will be ours,” he added. The launcher will be GSLV Mark III. The Indian Space Research Organisation reports that the GSLV Mark III, is its heaviest, tallest and most powerful rocket yet. The 42.4-meter-tall rocket will have a lift-off weight of 630 tons and can put a four-ton satellite into the geo-synchronous transfer orbit (GTO) or a 10-ton satellite into a low-earth orbit. Geosynchronous Satellite Launch Vehicle Mk.III

The Chandrayaan-II will have an orbiter (spacecraft) besides a lander-cum-rover. After the spacecraft reaches the lunar orbit, the lander-cum-rover will release from it and soft-land on the Moon by means of a powered descent. Mr. Annadurai said the entire orbiter would weigh 2,700 kg. Asked about his meeting with Mr. Karunanidhi, he said, it was a courtesy call. “I thanked him for his congratulatory messages,” he said.
 楼主| jingyan66 发表于 2009-1-22 10:13 | 显示全部楼层

“月船”-2上的有效载荷方案还未最终确定

Ambani institute working on projects for Chandrayaan-2

16 Nov 2008, 0035 hrs IST, Kumar Manish , TNN

AHMEDABAD: With Chandrayaan-1 already having entered the lunar orbit, get ready for Chandrayan-2. Indian Space Research Organisation (ISRO) is planning its second Moon Mission, Chandrayaan-2, in 2011 in a joint venture with Russia. Chandrayaan-2 will consist of a spacecraft and a landing platform with a moon rover.

And, Dhirubhai Ambani Institute of Information and Communication Technology (DAIICT) is abuzz with experiments for this second unmanned mission to the Moon.

Unlike Chandrayaan-1 which will orbit the Moon at an altitude of 100 km mapping topography and the mineralogical content of the lunar soil, Chandrayaan-2 mission involves a lunar orbiting spacecraft, a lander and a rover on the Moon's surface.

The rover will move on wheels on the lunar surface, pick up samples of soil or rocks, conduct a chemical analysis and send the data to the spacecraft orbiting above.

DAIICT is hard at work, developing a small device weighing around 200 gm based on sensor technology. This device will work on wireless network system to explore the presence of water on Moon's polar regions through close quarters.

Prabhat Ranjan, faculty at DAIICT, says, "We have submitted our proposal to PRL. We are planning to land 30 to 40 small devices which will collect moon samples from the polar regions and pass on the data to cluster heads and then die out. It is still in a very nascent stage."

"The cluster heads will sustain for a longer period and will transmit the collected data to the lunar rover or lander on the Moon surface," Ranjan adds.

On the number of scientific payloads on Chandrayaan-2, J N Goswami, director, Physical Research Laboratory (PRL) and mission director, Chandrayaan-1 says, "We have yet not finalized the scientific experiments for Chandrayaan-2. We have invited proposal from various institutes and organizations, but everything is still at a conceptual level."

"The response for submitting proposals has been great so far. The final experiments for the mission will only be decided through detailed scientific discussions," Goswami adds.
 楼主| jingyan66 发表于 2009-1-28 18:08 | 显示全部楼层

“月船”-2将由GSLV发射升空

Chandrayaan II to be launched on GSLV


Wednesday, Jan 28, 2009
Staff Reporter

Bangalore: Chandrayaan II will be launched on a Geosynchronous Satellite Launch Vehicle (GSLV) as opposed to the Polar Satellite Launch Vehicle used to launch Chandrayaan I, Madhavan Nair, Chairman of the Indian Space Research Organisation (ISRO), said here on Tuesday.

Speaking to reporters on the sidelines of the International Customs Day celebrations organised by the Bangalore Customs Commissionerate, Mr. Nair outlines the immediate plans of ISRO. “An ocean satellite, which is in the offing, would be launched by March or April. The satellite will be used to detect surface temperature and extra sensors to map the colour of the ocean have also been added to the satellite,” he said.
 楼主| jingyan66 发表于 2009-2-16 08:39 | 显示全部楼层
Work on Chandrayaan-II has started: Annadurai


Sunday, February 15, 2009 : 0300 Hrs        Hindu

Vellore (PTI): Encouraged by the successful launch of Chandrayaan-I, ISRO scientists had started work on Chandrayaan-II, which was expected to be ready by 2011-12, a top scientist said on Saturday.

The cost, estimated at Rs 450 crore, was, however, likely to go up further by the time of the launch, Chandrayaan-I executive director M Annadurai said here.

Delivering the keynote address at the convocation of the Marudhur Kesari Jain college here, he said that the youth could achieve expertise in their chosen fields and come out with successful inventions if they worked hard.

"We have 40 lakh youth in the country. If all of them, put together, work tirelessly, India will be a force to reckon with by 2020, as former President A P J Abdul Kalam has already predicted," he said.

Annadurai pointed to the example of ISRO engineers and scientists, who he said, had after years of hard work and some failures, successfully launched satellites.

District Collector Rajendran, who was present, handed out degree certificates to 229 candidates of the college.
 楼主| jingyan66 发表于 2009-3-3 08:51 | 显示全部楼层

俄印两国航天署3月份将完成探月计划

俄新网RUSNEWS.CN莫斯科3月2日电 俄罗斯联邦航天署与印度太空研究组织(ISRO)三月份计划完成俄印探月计划技术概念的协商工作并制定该计划的科学概念。这一消息是俄罗斯航天署透露的。

上周在莫斯科郊区希姆基市的拉沃奇金科研生产综合体举行了筹备和实施俄印探月计划的工作会议。根据双方2007年11月签署的协议,俄印两国航天署将联合实施探月计划。

在会议上,拉沃奇金科研生产综合体行星研究中心主任亚历山大·卢基扬奇科夫向与会者介绍了探月器飞行路线图以及着陆图。

根据这一图纸,将使用印度GSLV Mk-II运载火箭将进入环月的椭圆轨道,随后印度“月球初航二号”(Chandrayaan-2)探月器将飞往月球。最后俄罗斯的机器人车在月球南极附近着陆,而印度的卫星将进入极地轨道围绕月球进行飞行。
naugty 发表于 2009-3-3 09:52 | 显示全部楼层
俄新网RUSNEWS.CN莫斯科3月2日电

俄罗斯的机器人车在月球南极附近着陆,而印度的卫星将进入极地轨道围绕月球进行飞行。


jingyan66 发表于 2009-3-3 08:51


A3不准备自己搞着陆器和月球车了 ?那月船2中A3的看点就少了
darklighter 发表于 2009-3-3 10:05 | 显示全部楼层
“月船”2的消息已经不少,可以独立成一个主题了。
 楼主| jingyan66 发表于 2009-4-23 11:59 | 显示全部楼层

“月船(Chandrayaan)”2预计于2011年底或2012年初发射

Human in orbit in 7 yrs, Chandrayaan II launch 2011-12: ISRO


April 20, 2009,

Sriharikota: The Indian Space Research Organisation's (ISRO) is planning to send two humans to orbit in the next seven years. ISRO has submitted a Rs 12,400 crore ($ 2.5 billion) project report to the government for its approval. Meanwhile, 2009 is going to be the year of “fireworks” for ISRO, which scheduled four more launches in 2009 and Chandrayaan II launch in 2011-12.

G Madhavan Nair, chairman, ISRO said that government has approved pre project report Rs 90 crore for Human Space Mission. Now, a detail project report was submitted to the government for approval. He noted, the planning commission already approved the Rs 12,400 crore ($ 2.5 billion) mission.

The money will be spent for training Astronauts, setting up a launch pad, handling the crew, mission control system, technologies and hardware.

“We will be sending two humans for the orbit, 270 kms away from the Earth, in seven years”.

He also said 2009 is going to be the year of fireworks for ISRO and it would continue. "We will be launching Oceansat II, Gsat IV and Resourcesat and others. Indigenously developed cryogenic engine will be inducted this year." ISRO has scheduled four launches starting from June this year.

While giving update on Chandrayaan, which was launched end of 2008, he said it is doing well and sending pictures for the past six months. “Chandrayaan II launch plan is going on in full swing and it will be a soft launch,” said Nair.

The rocke